Skip to content

Playlists vs schedules vs sequences

Three concepts seem to do the same thing (put content on a screen), but each has its own job. Here is the quick comparison.

In one table

What you wantUse
One list of content that loopsPlaylist
Different content at different times or daysSchedule
A long rotation of several playlists, no time slotSequence

One sentence per concept

  • A playlist is a row of content items that plays and restarts.
  • A schedule determines which playlist plays in which time slot.
  • A sequence plays several playlists one after another, endlessly.

When you combine them

Often. A typical signage setup:

  1. You create playlists for each theme (Lunch, Evening, Christmas promo).
  2. You add those playlists to a sequence for long rotations without a time slot.
  3. For specific parts of the day or specific days, you use a schedule that lets a specific playlist or sequence take precedence over the normal schedule.

Priority when they overlap

A schedule takes priority over a sequence or a single playlist that is linked directly to the screen. If the schedule plans nothing for the current time slot, the player uses its fallback setting (often: the linked playlist or sequence).

Was this helpful?